• Skip to main content
  • Skip to search
  • Skip to footer
Cadence Home
  • This search text may be transcribed, used, stored, or accessed by our third-party service providers per our Cookie Policy and Privacy Policy.

  1. Blogs
  2. Academic Network
  3. From Rookie Season to Full Machine: The Boring Illini Team…
Kira Jones
Kira Jones

Community Member

Blog Activity
Options
  • Subscribe by email
  • More
  • Cancel
CDNS - RequestDemo

Discover what makes Cadence a Great Place to Work

Learn About
Cadence Academic Network
The Boring Illini
embedded systems

From Rookie Season to Full Machine: The Boring Illini Team's Next Chapter

20 Oct 2026 • 2 minute read

Written by Eva Allan and Isabella Wilhelm, members of The Boring Illini, an interdisciplinary student engineering team at the University of Illinois Urbana-Champaign

After an incredible rookie season at The Boring Company's Not-A-Boring Competition, The Boring Illini is coming back bigger, more ambitious, and ready to build a full machine. Last year, our team achieved an exciting list of firsts, including a successful rookie competition, the third-longest dig across all competition categories, a Mini competition, a world record, and the Rookie of the Year award. Those achievements gave us valuable experience but more importantly, they showed us what was possible. Now, we're taking everything we learned from that first season and using it to redesign and build a machine capable of competing at the full competition this year.

Building on What We Learned

Our new machine is being designed around both the successes and lessons from last year's competition. This season, we are introducing major new systems across the machine, including tunnel lining, navigation, and launch structures. At the same time, several of our core systems are being completely redesigned. The cutterhead, muck removal, propulsion, and electrical systems will all be improved as we work toward creating a more integrated and capable tunnel boring machine. One of our biggest developments this year is our multi-actuator navigation system. This system will allow the machine to steer and maintain its trajectory while operating underground.

Connecting the Machine

While each subsystem has its own engineering challenges, the real challenge lies in making everything work together. Our electrical and embedded systems will connect the machine's propulsion, navigation, muck removal, cutterhead, and safety systems. Rather than operating as separate components, these systems need to communicate and function as a single integrated machine.

From Design to Manufacturing

With our preliminary designs underway, the team is now moving toward manufacturing and testing. Before bringing the entire machine together, we will validate each subsystem individually. Testing these systems early will allow us to identify problems, make improvements, and ensure that each component is ready before full machine integration. This year represents a major step forward for The Boring Illini. We're taking the experience from our rookie season, applying what we learned, and turning those lessons into a completely redesigned machine. From navigation and propulsion to electrical systems and tunnel lining, every part brings a new engineering challenge. And as we move from the drawing board to manufacturing and eventually full machine testing, we're excited to see what this next chapter will bring.

The Boring Illini is playing a valuable role in shaping the future workforce through hands-on, practical experience outside the classroom; Cadence is proud to support their endeavors.

Learn more about the Cadence Academic Network.


CDNS - RequestDemo

Have a question? Need more information?

Contact Us

© 2026 Cadence Design Systems, Inc. All Rights Reserved.

  • Terms of Use
  • Privacy
  • Cookie Policy
  • US Trademarks
  • Do Not Sell or Share My Personal Information