• Skip to main content
  • Skip to search
  • Skip to footer
Cadence Home
  • This search text may be transcribed, used, stored, or accessed by our third-party service providers per our Cookie Policy and Privacy Policy.

  1. Community Forums
  2. Allegro X APD
  3. Relative delay analysis is impacted by pbar

Stats

  • State Not Answered
  • Replies 3
  • Subscribers 69
  • Views 8169
  • Members are here 0
More Content

Relative delay analysis is impacted by pbar

JS532
JS532 over 2 years ago

Does anyone know how to not include a pbar in a constraint manager analysis? I have some relative delay constraints applied on a group of differential nets. When I analyze the design these all show an error. If I delete the plating bar from the design they are all passing. The plating bar gets generated on the Substrate Geometry / Plating_Bar class. I understand that I could just delete the plating bar to verify the constraint but the issue is when I archive this design I would like it to be clean meaning it is in the final state for manufacturing AND passing all constraints according to design reviews.

Anyone have an idea? 

Thank you!

  • Sign in to reply
  • Cancel
Parents
  • mahimag
    0 mahimag over 2 years ago

    Hi JS532, Can you share what error you are getting?

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Verify Answer
    • Cancel
  • JS532
    0 JS532 over 2 years ago in reply to mahimag

    Hi mahimag,

    I don't get an error. What I get is values very different. When the pbar is present, the values are ~15ps. When the pbar is deleted, the values are ~5ps. The following are shown under the Name column for an example:

    CLKP: die.90:bga.A1 = 0.013ns relative delay within the match group

    pbar.76:bga.A1 = 0.012ns

    pbar.76:die.90 = 0.015ns

    Perhaps there's a way to exclude the pbar from the calculation but I haven't found it. It's located on the Substrate Geometry / Plating_Bar class so I'm not sure why it would be included in the calculation. The only way I have found that works is to delete pbar.

    I would attach some images but the interface isn't allowing me.

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Verify Answer
    • Cancel
Reply
  • JS532
    0 JS532 over 2 years ago in reply to mahimag

    Hi mahimag,

    I don't get an error. What I get is values very different. When the pbar is present, the values are ~15ps. When the pbar is deleted, the values are ~5ps. The following are shown under the Name column for an example:

    CLKP: die.90:bga.A1 = 0.013ns relative delay within the match group

    pbar.76:bga.A1 = 0.012ns

    pbar.76:die.90 = 0.015ns

    Perhaps there's a way to exclude the pbar from the calculation but I haven't found it. It's located on the Substrate Geometry / Plating_Bar class so I'm not sure why it would be included in the calculation. The only way I have found that works is to delete pbar.

    I would attach some images but the interface isn't allowing me.

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Verify Answer
    • Cancel
Children
  • mahimag
    0 mahimag over 2 years ago in reply to JS532

    Hi @JS532, in SPB 23.1, we have a property "Ignore_Length_Calc". This can be added to clines for this purpose.

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Verify Answer
    • Cancel
Cadence Guidelines

Community Guidelines

The Cadence Design Communities support Cadence users and technologists interacting to exchange ideas, news, technical information, and best practices to solve problems and get the most from Cadence technology. The community is open to everyone, and to provide the most value, we require participants to follow our Community Guidelines that facilitate a quality exchange of ideas and information. By accessing, contributing, using or downloading any materials from the site, you agree to be bound by the full Community Guidelines.

© 2026 Cadence Design Systems, Inc. All Rights Reserved.

  • Terms of Use
  • Privacy
  • Cookie Policy
  • US Trademarks
  • Do Not Sell or Share My Personal Information