• Skip to main content
  • Skip to search
  • Skip to footer
Cadence Home
  • This search text may be transcribed, used, stored, or accessed by our third-party service providers per our Cookie Policy and Privacy Policy.

  1. Community Forums
  2. Sigrity
  3. SI Engineers, This One's for You! - Live Experts Session...

Stats

  • State Not Answered
  • Replies 21
  • Subscribers 24
  • Views 493
  • Members are here 0
More Content

SI Engineers, This One's for You! - Live Experts Session on Aug 19th 2026

Renu Vibha
Renu Vibha 21 days ago

Curious about S-Parameters, Insertion Loss, or Return Loss?

Bring your questions and join our upcoming Cadence Sigrity SI/PI Live Experts Session.

Learn proven analysis techniques, hear practical use cases, and interact directly with Cadence specialists.

Topic - Pre-layout Simulations covering Aurora Workflows, Topology Workbench (Pre-layout), Power SI ERC

Participate here  on August 19th at 7:30-8:30PM IST.

Bring your questions. Leave with answers

  • Sign in to reply
  • Cancel

Top Replies

  • AK20250609765
    AK20250609765 4 days ago in reply to EDAHut +1
    Thank you for the question. To maintain the validity of pre-layout signal integrity (SI) results when the PCB stackup changes during the design cycle, follow these steps: Correctly Model Devices: Ensure…
Parents
  • EDAHut
    0 EDAHut 4 days ago

    Where does the handoff from schematic driven topologies to physical layout in Cadence Sigrity Aurora break down the most ?

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Verify Answer
    • Cancel
  • EDAHut
    0 EDAHut 4 days ago in reply to EDAHut

    During pre layout engineer creates a tuned LPDDR4 memory topology with specific termination resistors using generic schematic nodes … when transferring this to physical layout , mismatching pin names between the schematic symbols and the actual layout footprints break the net connectivity mapping in Aurora .. this completely resets the constraint manager rules, forcing the layout team to manually reassign routing constraints from scratch 

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Verify Answer
    • Cancel
  • AK20250609765
    0 AK20250609765 4 days ago in reply to EDAHut
    The handoff typically breaks down when the logical connectivity used during topology creation no longer matches the physical implementation. Pin-name mismatches, component-definition differences, or connectivity mapping issues can prevent correct constraint transfer, forcing manual re-assignment of routing constraints in the layout flow. Maintaining consistent schematic-to-layout mapping is key.
    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Verify Answer
    • Cancel
Reply
  • AK20250609765
    0 AK20250609765 4 days ago in reply to EDAHut
    The handoff typically breaks down when the logical connectivity used during topology creation no longer matches the physical implementation. Pin-name mismatches, component-definition differences, or connectivity mapping issues can prevent correct constraint transfer, forcing manual re-assignment of routing constraints in the layout flow. Maintaining consistent schematic-to-layout mapping is key.
    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Verify Answer
    • Cancel
Children
No Data
Cadence Guidelines

Community Guidelines

The Cadence Design Communities support Cadence users and technologists interacting to exchange ideas, news, technical information, and best practices to solve problems and get the most from Cadence technology. The community is open to everyone, and to provide the most value, we require participants to follow our Community Guidelines that facilitate a quality exchange of ideas and information. By accessing, contributing, using or downloading any materials from the site, you agree to be bound by the full Community Guidelines.

© 2026 Cadence Design Systems, Inc. All Rights Reserved.

  • Terms of Use
  • Privacy
  • Cookie Policy
  • US Trademarks
  • Do Not Sell or Share My Personal Information