• Skip to main content
  • Skip to search
  • Skip to footer
Cadence Home
  • This search text may be transcribed, used, stored, or accessed by our third-party service providers per our Cookie Policy and Privacy Policy.

  1. Community Forums
  2. Custom IC SKILL
  3. Adding Connectivity in Power Nets

Stats

  • Locked Locked
  • Replies 3
  • Subscribers 143
  • Views 13958
  • Members are here 0
This discussion has been locked.
You can no longer post new replies to this discussion. If you have a question you can start a new discussion

Adding Connectivity in Power Nets

Debasis Sahu
Debasis Sahu over 12 years ago

Hi,

Need a script that can add connectivity property in all the power nets ( VDD,VSS,VDDB etc. ) in the cell layout. Inputs can be list of cells or a top level gds that contains multiple cells with multiple hierarchy.

 

Thanks 

 

  • Cancel
Parents
  • Debasis Sahu
    Debasis Sahu over 12 years ago

    Hi Andrew,

    You are correct. Using VLS XL will solve the problem. But the poin is current database is not VXL compliance and it will take considerable effort to clean up and make it VXL compatable. My current requirement is to find the top power and ground nets and fill via to hook up to the top level metal. My current via fill script is able to fill via where it finds a connectivity information, if it is missing it is not able to add. and now I have to add manually the conneectivity for the metals where it is missing. I want to avoid that . Hope you are clear about the situation.

    My Proposal :

    1. Use PVS/Calibre/Assura on the LVS clean database to get the connectivity information

    2. Pass that database to skill and add property in the net.

    I am trying to write it. But just posted in the forum to avoid reinventing the same :)

    Regards,

    Debasis 

     

    • Cancel
    • Vote Up 0 Vote Down
    • Cancel
Reply
  • Debasis Sahu
    Debasis Sahu over 12 years ago

    Hi Andrew,

    You are correct. Using VLS XL will solve the problem. But the poin is current database is not VXL compliance and it will take considerable effort to clean up and make it VXL compatable. My current requirement is to find the top power and ground nets and fill via to hook up to the top level metal. My current via fill script is able to fill via where it finds a connectivity information, if it is missing it is not able to add. and now I have to add manually the conneectivity for the metals where it is missing. I want to avoid that . Hope you are clear about the situation.

    My Proposal :

    1. Use PVS/Calibre/Assura on the LVS clean database to get the connectivity information

    2. Pass that database to skill and add property in the net.

    I am trying to write it. But just posted in the forum to avoid reinventing the same :)

    Regards,

    Debasis 

     

    • Cancel
    • Vote Up 0 Vote Down
    • Cancel
Children
No Data

Community Guidelines

The Cadence Design Communities support Cadence users and technologists interacting to exchange ideas, news, technical information, and best practices to solve problems and get the most from Cadence technology. The community is open to everyone, and to provide the most value, we require participants to follow our Community Guidelines that facilitate a quality exchange of ideas and information. By accessing, contributing, using or downloading any materials from the site, you agree to be bound by the full Community Guidelines.

© 2025 Cadence Design Systems, Inc. All Rights Reserved.

  • Terms of Use
  • Privacy
  • Cookie Policy
  • US Trademarks
  • Do Not Sell or Share My Personal Information