• Skip to main content
  • Skip to search
  • Skip to footer
Cadence Home
  • This search text may be transcribed, used, stored, or accessed by our third-party service providers per our Cookie Policy and Privacy Policy.

  1. Community Forums
  2. Functional Verification
  3. ICC data in eManager

Stats

  • Locked Locked
  • Replies 2
  • Subscribers 65
  • Views 14352
  • Members are here 0
This discussion has been locked.
You can no longer post new replies to this discussion. If you have a question you can start a new discussion

ICC data in eManager

archive
archive over 17 years ago

    Has anybody tried to load ICC data from multiple DUTs that have automatically generated coverage models for each in the same eManager session?

Scenario is that, as an integrator, I want to be able to analyze coverage for all blocks that make up the next level of integration.  The blocks have block level environments that I can easily run together in one session(vsif) (or multiple sessions, one for each but  the problem exists with either method).  Each run in the session creates the coverage models, vplans and coverage data.  I can load the session and do test run analysis on the session with no issues. However, when I go into the vplan view to analyze coverage in eManager, the "merge" fails and no coverage information is calculated.  This was tried with a pre-6.2 version of eManager, so I am using the icc adapter.  Maybe 6.2 helps with this problem.

Anybody try something similar? Solutions?


Originally posted in cdnusers.org by artmaj1
  • Cancel
Parents
  • archive
    archive over 17 years ago

    We have introduced unified coverage format in 6.2 so all the simulation engines (specman, ncsim) are capable of writing coverage in common format that enterprise manager can understand. So you would not need to use ICC adapter anymore. You will be able to perform exact same operations (ranking, hole analysis, etc) for code coverage in enterprise manager. Please contact your local AE for migration steps.


    Originally posted in cdnusers.org by pjigar
    • Cancel
    • Vote Up 0 Vote Down
    • Cancel
Reply
  • archive
    archive over 17 years ago

    We have introduced unified coverage format in 6.2 so all the simulation engines (specman, ncsim) are capable of writing coverage in common format that enterprise manager can understand. So you would not need to use ICC adapter anymore. You will be able to perform exact same operations (ranking, hole analysis, etc) for code coverage in enterprise manager. Please contact your local AE for migration steps.


    Originally posted in cdnusers.org by pjigar
    • Cancel
    • Vote Up 0 Vote Down
    • Cancel
Children
No Data

Community Guidelines

The Cadence Design Communities support Cadence users and technologists interacting to exchange ideas, news, technical information, and best practices to solve problems and get the most from Cadence technology. The community is open to everyone, and to provide the most value, we require participants to follow our Community Guidelines that facilitate a quality exchange of ideas and information. By accessing, contributing, using or downloading any materials from the site, you agree to be bound by the full Community Guidelines.

© 2025 Cadence Design Systems, Inc. All Rights Reserved.

  • Terms of Use
  • Privacy
  • Cookie Policy
  • US Trademarks
  • Do Not Sell or Share My Personal Information