• Skip to main content
  • Skip to search
  • Skip to footer
Cadence Home
  • This search text may be transcribed, used, stored, or accessed by our third-party service providers per our Cookie Policy and Privacy Policy.

  1. Community Forums
  2. Adams Car
  3. A/Explore not compatible with Office 365?

Following Cadence Design Systems’ acquisition of the Design & Engineering (D&E) business, the D&E Community Forum on the Nexus Community Center has been migrated in the Cadence Physical System Simulation Community. For more details and if you have any questions, please refer to the FAQ.

Stats

  • State Not Answered
  • Replies 2
  • Subscribers 1
  • Views 1
  • Members are here 0
More Content

A/Explore not compatible with Office 365?

GMatrang
GMatrang over 8 years ago
Dear all,
 
while using A/Explore 2017.2 I have a problem, probalby caused by the fact the I use Office 365. Shortly:
 
1) I generate a Workbook from an Adams/Car model
2) I open the excel file and save it again without no change
3) I import the workbook for the open model
 
In doing that I have the following message:
 
Opening XLSX-File: C:/Adams/temp/office_365/test_export.xlsxERROR: ---------------------------------------------------------------------
ERROR: <type 'exceptions.TypeError'>: __init__() got an unexpected keyword argument '{schemas.microsoft.com/.../revision}uid'
ERROR: ---------------------------------------------------------------------
ERROR: The execution of the following python command failed:
ERROR: ws_model=wb['Model']
ERROR:
ERROR: Import aborted!
 
 
Using a stand-alone version of Excel doesn't bring to any problem...
 
I didn't find any trace of incompatibility with Office 365 in the release guide, so I don't know if it's an issue or if I have to set Adams or Excel in a particular way to make it work.
 
Does anyone already had/solved the issue?
 
Many thanks in advance,
Giuseppe.
  • Sign in to reply
  • Cancel
Parents
  • jozef.bucha
    0 jozef.bucha over 8 years ago
    Hello Giuseppe,
     
    I tried it using office365 (2016) and Adams 2018, it is working for me without problem. I was using working dir for saving .xls file
     
    Jozef
    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Verify Answer
    • Cancel
Reply
  • jozef.bucha
    0 jozef.bucha over 8 years ago
    Hello Giuseppe,
     
    I tried it using office365 (2016) and Adams 2018, it is working for me without problem. I was using working dir for saving .xls file
     
    Jozef
    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Verify Answer
    • Cancel
Children
No Data
Cadence Guidelines

Community Guidelines

The Cadence Design Communities support Cadence users and technologists interacting to exchange ideas, news, technical information, and best practices to solve problems and get the most from Cadence technology. The community is open to everyone, and to provide the most value, we require participants to follow our Community Guidelines that facilitate a quality exchange of ideas and information. By accessing, contributing, using or downloading any materials from the site, you agree to be bound by the full Community Guidelines.

© 2026 Cadence Design Systems, Inc. All Rights Reserved.

  • Terms of Use
  • Privacy
  • Cookie Policy
  • US Trademarks
  • Do Not Sell or Share My Personal Information